MEER AGRUPADOS, S.L.
Construction of three «TYPE A» industrial buildings according to Royal Decree 2267/2004, with no specified use.
Location: Sta. Perpètua de Mogoda.
Year: 2022
Services
– Project for demolition of the existing building.
– New building’s basic and executive projects.
-Safety study, health and safety coordination, site management and quality control.
–Design projects and installations legalisation.
-Servicios Project Management.
PROJECT DESCRIPTION
Industrial building between dividing walls consisting of 3 A-type facilities in accordance with Royal Decree 2267/2004. The structure and envelopes are made of pre-stressed concrete and TPO roofing.
Each of the 3 facilities, of 440m², 470m² and 700m² constructed, has a mezzanine floor to house offices. They will also have sectional doors for loading and unloading operations inside.
The building is structurally prepared to house medium-5 fire risk activities and is equipped with an automatic fire detection system and BIEs.
It is built for rental operation to house 1, 2 or 3 different activities.
PHOTO ARCHIVE