MEER AGRUPADOS, S.L.

Sta. Perpètua de Mogoda

MEER AGRUPADOS, S.L.

Construction of three «TYPE A» industrial buildings according to Royal Decree 2267/2004, with no specified use.

Location: Sta. Perpètua de Mogoda.
Year: 2022

 

Services

– Project for demolition of the existing building.
– New building’s basic and executive projects.
-Safety study, health and safety coordination, site management and quality control.
Design projects and installations legalisation.
-Servicios Project Management.

PROJECT DESCRIPTION

Industrial building between dividing walls consisting of 3 A-type facilities in accordance with Royal Decree 2267/2004. The structure and envelopes are made of pre-stressed concrete and TPO roofing.
Each of the 3 facilities, of 440m², 470m² and 700m² constructed, has a mezzanine floor to house offices. They will also have sectional doors for loading and unloading operations inside.

The building is structurally prepared to house medium-5 fire risk activities and is equipped with an automatic fire detection system and BIEs.

It is built for rental operation to house 1, 2 or 3 different activities.

 

PHOTO ARCHIVE

 

Videos